Stay Updated with Geso and Connect Global Innovation

Ditong —Temperature and Humidity Environment Solution

Sep 10, 2025

Client: Ditong Auto Parts Co., Ltd.  

Profile: A professional automotive components manufacturer  

Project Name: Hot Stamping Line Process Chilling System Project  

Industry: Automotive Parts Manufacturing  

Project Overview

Aspect Implementation Details
Client Ditong Auto Parts Co., Ltd.
Solution Hot Stamping Process Chilling System
Objective Provide process chilling system for two hot stamping lines
Installation Outdoor modular installation

Technical Implementation

Technical Implementation  

 

Refrigeration System Integration  

Complete water-cooled screw chilling system including:  

-  water-cooled screw chiller unit  

- Matching cooling tower system  

- Pumps and ancillary equipment  

- Complete piping and control system  

 

System Performance Features  

- Die cooling: Inlet temperature 7~25adjustable, flow rate 80~120m³/h adjustable, pressure 3~8bar adjustable  

- Press cooling: Independent water supply system, inlet temperature <30, flow rate 60m³/h per press, pressure 3~5bar  

- Dual-line design: Meets current production line requirements with interfaces reserved for second production line  

 

Intelligent Control System  

- Siemens S7-1200 series PLC  

- Equipped with upper computer data acquisition system  

- Real-time monitoring of temperature, pressure, and flow parameters  

- Remote adjustment and control capabilities  

lithium battery cathode materials—Cleanroom and Power Environment Solution
Serbia - Industrial Plant MEP General Contracting